If you’re developing a wind farm or solar farm, talk to TLI Group about our range of grid connection and substation turnkey services including station design, grid connection design (both overhead and underground cable), optimum route selection, landowner negotiations, planning permission applications, construction and substation commissioning. Think contestable……Think TLI. Contact for further information.