TLI Group commissioning a busbar protection scheme with integrated circuit breaker fail protection at Dungarvan 38 kV modular substation. This station has been integrated into an existing brownfield 110 kV substation. TLI Group are currently operating under a DWA (Designated Work Area) in this station.