Grouse Lodge Windfarm

TLI have recently installed a load break switch on the Grouse Lodge Windfarm Network Connection for ESB Wind.

The work was undertaken by one of the experienced TLI High Voltage teams.

The project involves 7KM 38kV windfarm network connection including 11 no. type 63C towers, 55 double wood polesets and 7kM of 300’s conductor.