Boggeragh Windfarm

The 57MW Boggeragh Windfarm located in Co. Cork is Ireland's largest stand alone Windfarm. TLI were contracted to undertake the Network connection design utilising the latest ESB and Eirgrid compatible line design software and to secure approval from Eirgrid.

Project Scope

TLI designed and constructed the 13.3 kilometres of 110kV over-head network connection across the mountainous terrain of the Boggeragh Mountains to the Clashavoon sub-station.